Construction Progress 1

August 2006

Alhamdulillah the groundworks have now been completed ready for the steelworks to commence InshaAllah.

 

September 2006

The steelworks have been installed up to the first floor level.

 

October 2006

The steelworks have progressed very well and ground floor and first floor concrete slabs in situ

 

Spring 2007

Alhamdulillah the steelworks and staircases have now been installed

View from corner of Bold Street and Willoughby Street

 

View from corner of Bold Street and Altom Street




View from corner of Bicknell Street and Altom Street


April 2007

Roofworks have now commenced




June 2007

The Masjid dome is installed

 

 



H.E. Mr.Khalid Rashid Al-Hamoudi Al-Mansouri Ambassador of Qatar pictured with Lord Adam Patel of Blackburn, President of Masjid e Tauheedul Islam 

 



 August 2007

View from corner of Bicknell Street and Altom Street


November 2007

Alhamdulillah excellent progress has been made

 View from corner of Bicknell Street and Altom Street

 

 View down Bicknell Street

 

 

View from corner of Bold Street and Altom Street

 

External view of the mimbar


December 2007

 Internal view of the jamaat khana

 

 Close up external view of the mimbar

 

 Close up external view of the black tile finish either side of the mimbar

 

 Internal view of the first floor

 

 Another internal view of the first floor

 

 Internal view of the second floor

 

Another internal view of the second floor showing the dome and the mezzanine floor

 

View of the lift shaft from the second floor

 

 

 

January 2008

 Additional work to the dome